top of page
Search
Advanced VDC for the $200M Chino High School Rebuild
For the ENR award-winning $200M Chino High School rebuild, ScanTek 3D deployed advanced Virtual Design and Construction (VDC) solutions. By meticulously coordinating complex exterior systems across seven new buildings on an active campus, our precise planning overcame severe logistical constraints and supply chain disruptions to deliver architectural excellence without delaying educational innovation. What Were the VDC Deliverables for the $200M Chino High Rebuild? Revitaliz
20 hours ago


Design Meets Data for Laser-Cut Shade Panels at Westfield UTC
For the Westfield UTC laser-cut shade panel installation, ScanTek 3D provided high-resolution LiDAR scans to California Sheet Metal. By delivering field-verified dimensions and exact cable attachment layouts that accounted for seismic movement, we eliminated fabrication guesswork, reduced field rework, and ensured a seamless, flawless installation. Why is LiDAR Critical for Custom Shade Structures? When it comes to complex fabrication and architectural design accuracy, it al
Apr 6


Flawless Panel Prefabrication for the Mt. SAC Student Center
For the Mt. SAC Student Center, ScanTek 3D delivered high-precision 3D scanning and accurate as-built models for complex exterior and interior panel systems. By capturing true site conditions, our detailed documentation enabled facade fabricators to prefabricate panels perfectly, accommodating all design discrepancies and ensuring flawless, zero-rework installation. Why Use As-Built Models for Facade Shop Drawings? The Mt. SAC Student Center serves as a vital hub for student
Apr 3


bottom of page
_edited_edited_.png)